Uncover Chic&versatile Apparel:Blouses,Dresses,Jackets&More
Uncover Chic&versatile Apparel:Blouses,Dresses,Jackets&More Uncover Chic&versatile Apparel:Blouses,Dresses,Jackets&More
Home Tops Printed Tops
TOPS Noteworks Project Planner

TOPS Noteworks Project Planner

$ 6.36

$ 0.00

Save: $

Title:
  • DefaultTitle
Unavailable
Please select combo product attributes
The combo subtotal is $,SAVE$

Product Details

General Information

Manufacturer: TOPS Products
Manufacturer Part Number: 63826
Manufacturer Website Address:
Brand Name: TOPS
Product Line: Noteworks
Product Name: Noteworks Project Planner
Marketing Information: Noteworks Project Planner features a special ruling simple and concise notes. Gold metallic plastic cover stands up under heavy use. Numbered line format is printed on the front and back. Letr-Trim perforation on each 16 lb. acid-free sheet allows clean tear-out. Heavy, 60 point chipboard back offers reliable writing support. Coil-lock wire binding on the side prevents snagging.
Packaged Quantity: 1 Each
Product Type: Planner

Product Information

Sheet Quantity: 70
Sheet Height: 8 1/2"
Sheet Width: 6 3/4"
Binding Type: Wire Bound
Cover Color: Metallic Gold
Sheet Color: White
Features:
  • Perforated
  • Acid-free
  • Tear-off
  • Snag Resistant

Physical Characteristics

Material:
  • Poly
  • Plastic
  • Chipboard

Thickness: 310 mil

Miscellaneous

Recycled: No
Assembly Required: No
Country of Origin: United States

You May Also Like

Nanette Blouse in Blue Lagoon Pineapple
Nanette Blouse in Blue Lagoon Pineapple

$ 29.07

Save: $

Chiara Long Maxi Dress
Chiara Long Maxi Dress

$ 34.89

Save: $

ENZA COSTA DOUBLED Grey Tank
ENZA COSTA DOUBLED Grey Tank

$ 36.95

Save: $

Straight Neck Bias Maxi Dress
Straight Neck Bias Maxi Dress

$ 40.91

Save: $

Hit Them With A Pop of Fuchsia Floral Blouse | FINAL SALE
Hit Them With A Pop of Fuchsia Floral Blouse | FINAL SALE

$ 25.79

Save: $

Patti Top - Bronze
Patti Top - Bronze

$ 60.00

Save: $

Aria Top Cranberry
Aria Top Cranberry

$ 35.40

Save: $

Zenana V Neck Sleeveless Cami Top
Zenana V Neck Sleeveless Cami Top

$ 18.95

Save: $

Mens Denim Jacket Black
Mens Denim Jacket Black

$ 33.31

Save: $

Viv - V-neck Maxi Dress
Viv - V-neck Maxi Dress

$ 40.67

Save: $

Cart
Uncover Chic&versatile Apparel:Blouses,Dresses,Jackets&More
Your cart is currently empty.